I am a [login to view URL] in Mechanical Engineer. I have 12 years of working Experience in AutoCAD Expert, MEP Design & Drawing of Fire Fighting/Protection System, Fire Alarm/ Detection system, HVAC System, Plumbing & Sanitation system, Electrical System. I have completed more than 200 local MEP & Architectural projects in Bangladesh & Ethiopia. Those are included in Residential Building, Commercial Building, Office, Factory, Hotel, Educational Institute, Shopping mall, Cantonment, Hospital, Pharmaceuticals, Metro rail, etc. in many Design Consulting Firm, Construction Firm, Real estate Firm & Garment Companies With a Completed Bachelor's degree focused on Mechanical Engineering from reputed Engineering University in Bangladesh. Now I am working as an MEP Design Engineer in the Dhaka Metro Rail project.
Please check my portfolio and work history for a sample of my previous work.
Project description:
Fire Fighting/Protection & Fire Alarm/ Detection system.
1. Fire Hydrant system design & Drawing
2. Fire Sprinkler system design & Drawing
3. Fire Alarm system design & Drawing
4. Pump Head Calculation Using by Hazen Willam formula
5. Pump flow Calculation
6. Pipe Size calculation
7. Calculation of friction loss in the piping system
8. Hydraulic Calculation
9. Fire Suppression system calculation.
10. Firewater tank Calculation
11. Battery capacity calculation
12. Cable size calculation
13. Fire Alarm Panel capacity calculation, etc.
14. Preparation of schedule of materials / Bill of Quantities (BOQ)
Plumbing and Sanitation system:
1. Drainage system design & Drawing
2. Water supply system design & Drawing
3. Rain / Stormwater system design & Drawing
4. Vent system design & Drawing
5. Drainage pipe diameter calculation
6. Septic Tank system design & Drawing
7. Water supply-demand calculation
8. Fixture demand calculation
9. Water supply pipe diameter calculation
10. Hydropneumatic pump / Pressure Booster Head & Flow calculation
11. Water lifting pump Head & Flow calculation
12. Submersible pump Head & Flow calculation
13. Underground water tank size calculation
14. Overhead water tank calculation
15. Preparation of schedule of materials / Bill of Quantities (BOQ)
HVAC (Heating Ventilation Air Conditioning) System:
1. HVAC system Cooling Load Calculation,
2. HVAC system Heating Load Calculation,
3. Exhaust / Ventilation system design & drawing
4. Fresh air system design & drawing
5. HVAC system Psychometric Analysis
6. Duct size design & calculation
7. Pipe Size Design & calculation
8. Calculation of friction loss in the piping system
9. Pipeline pressure drop calculation
10. Duct pressure drop calculations
11. Supply air diffuser size calculation
12. Return air Grill size calculation
13. Preparation of schedule of materials / Bill of Quantities (BOQ)
Prepare to design concept according to Codes and Standards: BNBC, NFPA, ASHRAE | SMACNA | SS-553 | IPC | BS | NBC